Work Management System -wms- Adnoc Pdf -

This content is tailored to reflect the typical rigor, HSE focus, and asset management standards of ADNOC (Abu Dhabi National Oil Company). 1. Introduction 1.1 Purpose of the WMS 1.2 Scope (Upstream, Downstream, Refining, Petrochemicals) 1.3 Alignment with ADNOC’s Operational Excellence (OE) System

- Maintenance Planner / Scheduler - Operations Authority - Maintenance Supervisor - Contractor / Vendor - CMMS Data Steward

The ADNOC Work Management System (WMS) provides a standardized framework for the safe, efficient, and reliable execution of all maintenance and operational work across ADNOC Group’s assets. It integrates with the ADNOC Operational Excellence (OE) System and enforces rigorous Permit to Work (PTW) protocols to ensure zero harm, maximum asset integrity, and optimized lifecycle cost.

- Technical report & as-maintained data - Feedback loop into maintenance strategy - KPIs data capture (Schedule compliance, backlog) work management system -wms- adnoc pdf

- Weekly WMS review meetings - Root cause analysis for schedule breaks - Lessons learned from turnarounds

- Planned work percentage (Target: >85%) - Schedule compliance (Target: >90%) - Backlog trend (weeks of work) - PTW turnaround time - Rework percentage

2.1 Lifecycle Asset Management 2.2 HSE First: Permit to Work (PTW) Integration 2.3 Reliability Centered Maintenance (RCM) 2.4 Competency Assurance This content is tailored to reflect the typical

| OE Pillar | WMS Contribution | |-----------|------------------| | HSE | PTW, risk assessment, SIMOPS, LOTO | | Asset Management | Preventive & predictive maintenance planning | | Continuous Improvement | Work feedback loop and KPI monitoring | | Competency | Role-based WMS training and assurance |

- A – Typical Work Order Coding Structure (ADNOC) - B – Priority Matrix (Safety, Production impact) - C – Job Safety Analysis (JSA) Template - D – Abbreviations and Definitions Sample Content (Page 1 – Executive Summary Style) 1. Introduction

| Priority | Definition | Planning Window | Execution Window | |----------|------------|----------------|------------------| | P0 (Emergency) | Imminent HSE or major production loss | 0 hr | Immediate | | P1 (Urgent) | Significant degradation | 4-8 hrs | 24 hrs | | P2 (Planned) | Routine corrective/preventive | 2 weeks | 4 weeks | | P3 (Deferrable) | Minor improvement / low risk | Next shutdown | Next opportunity | It integrates with the ADNOC Operational Excellence (OE)

6.1 Use of Maximo / SAP PM (typical ADNOC CMMS) 6.2 Mobile Workforce Management (Tablet-based job packs) 6.3 Dashboard & Analytics (Power BI / ADNOC Panorama) 6.4 Future: AI for predictive work scheduling

3.1 High-Level Process Flow 3.2 Interfaces with Other Systems (ERP, CMMS, Digital Twin)