Saudi Aramco Schedule G 【RELIABLE — 2024】
If referencing specific manuals, use the document number (e.g., SA-DWO-HSERM-002-R0 ) to show technical accuracy [5]. Focus on Responsibility: Explicitly state which materials were Company Provided
, piping, or manifold components) required for Schedule G compliance [2]. Manpower & Milestones:
Report on the total man-hours worked without Lost Time Injuries (LTI) [2]. Documentation (NMR): Reference the Non-Material Requirements (NMR) submitted, such as (General Arrangement Drawings) or (Certified construction drawings) [11, 14]. Material Sourcing: 9COM or 9CAT materials used that required specific buyer approval [13]. Tips for a Professional Report Be Precise:
requirements that a contractor must follow [5, 7]. Specifically, it often outlines the materials, tools, and equipment saudi aramco schedule g
Use this if your report is about upgrading a facility (like a rig) to meet Saudi Aramco's "Schedule G" standards [1, 2]. Drafting Structure: Project Scope: Detail the specific upgrades (e.g., helideck modifications
Depending on your specific needs, here are two ways to draft this report. Option 1: HSE Compliance Report (Standard Use)
In Saudi Aramco contracts, Schedule G traditionally covers the Health, Safety, and Environmental (HSE) If referencing specific manuals, use the document number (e
Use this if you are reporting on a project's adherence to safety protocols as defined by Saudi Aramco's Health, Safety, and Environmental Requirements Manual Focus Areas Executive Summary
provided by the company and the contractor's responsibilities for managing them safely [7].
Steps to rectify any non-compliance identified during inspections. Option 2: Technical/Refurbishment Progress Report Specifically, it often outlines the materials, tools, and
Brief overview of the project's safety performance and any major Schedule G milestones reached. Asset Management Tracking of company-provided tools and equipment (as per Schedule G Attachment Regulatory Compliance Confirmation that all equipment meets and Aramco's Well Control Manual where applicable [5]. Incident Reporting Summary of any safety incidents reported via Aramco Emergency Protocols (e.g., dialing 110 for emergencies) [10]. Action Plan
versus Contractor Provided to avoid liability confusion [7]. Use Proper Channels: For any project-specific questions, consult the Saudi Aramco Supplier Portal for the most current templates [12]. Are you drafting this for a safety audit weekly progress update for a construction project?