Perhitungan Pondasi Tangki -
Submit revised calculation within 10 working days. Reviewer Signature: _________________
Project Title: Foundation Design for [Tank Name/Code, e.g., T-101] Reviewer: [Your Name/Role] Date: [Current Date] 1. Executive Summary The submitted tank foundation calculation has been reviewed against relevant standards (e.g., API 650, SNI 2847, or DIN 1054). Overall, the calculation methodology is logically structured, but several critical aspects require revision to ensure long-term serviceability, safety, and compliance with geotechnical and seismic requirements. Perhitungan Pondasi Tangki