Analisa Harga Satuan Pekerjaan Partisi Gypsum 2 Muka Info

For a , the unit price analysis typically includes materials, labor, and tools for a hollow metal frame or runner-channel system (e.g., 75-100 mm T-bar or C-H studs) covered both sides with gypsum boards.

Below is a (Indonesia RAB format – SNI or common market prices). A. Material Components (per m²) | Material | Specs | Quantity | Unit | |----------|-------|----------|------| | Gypsum board | 9–12 mm, 1200×2400 mm (2 sides) | 2.10 | sheets (including waste) | | Hollow metal stud (C-channel) | 0.8 mm, 75–100 mm | 3.5 | m | | Runner/U-channel (top & bottom) | 0.8 mm | 0.8 | m | | Gypsum screws | black phosphate, 1" | 35 | pcs | | Joint compound (filler) | ready-mix | 1.2 | kg | | Fiberglass joint tape | 50 mm width | 2.2 | m | | Corner bead (if external corners) | PVC or metal | 0.3 | m | | Rockwool insulation (optional) | thickness 40 mm | 0.2 | m² | B. Labor (per m²) | Work type | Man-days/m² | |-----------|-------------| | Install metal framing | 0.07 | | Install 1st side gypsum | 0.05 | | Install 2nd side gypsum + screws | 0.05 | | Jointing, taping, first coat | 0.08 | | Sanding & second coat (if needed) | 0.06 | analisa harga satuan pekerjaan partisi gypsum 2 muka